Leisuwash specializing in manufacture Automatic Car Wash Machine, Touchless Car Wash , Automatic Touchless Car Wash, touchless car wash equipment, robot car wash, smart car wash system, leisuwash 360, leisuwash leibao 360, laserwash 360, leisuwash touchless car wash machine, leisu wash touchless car wash automatic, leisu wash 360 high pressure touchless car wash equipment, robo car wash, touch free car wash, leisuwash 360 touch free car wash, leisuwash 360 price, automatic car wash price, leisuwash in malaysia, no touch automatic car wash machine, leisuwash 360 mini, leisuwash SG fully automatic car wash equipment. Automatic Car Wash Equipment,Leisuwash S90 Drying,Automatic Leisuwash S90 Drying Car Wash Machine,Leisuwash S90 Drying Car Wash Machine Hangzhou Leisu Cleaning Equipment Co.,Ltd , https://www.sdlaserwash.com
Leisuwash S90 touchless car wash machine high intelligent high quality, with car wash + car care + drying process totally, each car wash takes time 1 minute to 5 minutes which depends on the car wash mode.
Leisuwash S90 Car Wash Machine is an entry level car wash unit, but you won`t find any low grade components and no cost cutting on the expense of quality. Each Leisuwash S90 is built by Leisuwash employees in accordance with our usual quality standards, the low price is achieved by high standardization and the use of proven technology. The Leisuwash S90 is for clients that need a wash machine at a competitive price with higher ROI.
The height of the stage bracket filling method is generally 25 to 30 m. When the thickness of the steeply inclined ore body is less than 10 m, if the ore and surrounding rock are slightly stable, the section height of 50 to 60 m may be taken.
Most of the mining work of the box bracket filling method is arranged in the mine body, and the sampling ratio of 1000 tons is 30-40m. The stage transportation lanes are excavated in the surrounding rock of the ore body. When the ore body is very thick, it is generally necessary to dig a tunnel in the center of the ore body, and tunnel the tunnel to the width of the vertical strip or the width of the mine, and thereby dig up the filling patio. The patio size is generally 1.5 x 2.1 m, divided into three compartments. The patio is generally arranged near one of the upper and lower plates, and the vertical dividing scheme is to arrange a two-grid patio in the center of the ore body. With the upward recovery, the side frame is used to set up the mine and the sidewalk.